
James Fisher successfully completed the world’s first abrasive cut on a 10m-diameter offshore wind turbine monopile, on behalf of an international energy operator.
Customer challenge
An offshore wind operator identified a flaw in the foundation of a 10m diameter monopile after installation. With no proven method to safely sever this large structure, they faced a significant challenge in safely removing it while minimising downtime and reducing environmental impact.
Solution for our customer
James Fisher designed, built, tested and deployed a bespoke external abrasive cutting tool – the first of its kind capable of tackling monopiles of this scale. The tool was deployed subsea to complete an abrasive waterjet cut in one pass.
Our impact to our customer
-
Safe and rapid removal of the flawed monopile, enabling recovery to the vessel deck without incident
-
Reduced environmental impact thanks to shorter operational timeframe
-
Cost efficiency through a purpose-built tool which avoided the need for multiple interventions
-
This approach combined the efficiency and reliability developed through decades of oil and gas projects with innovation tailored to offshore wind’s unique demands

Download the "World-first 10m diameter wind turbine monopile severance" case study to share with your team.
More case studies
Read article
Ageing Assets: Helping South America’s Onshore Energy Industry Plan with Confidence
Read article
New Uruguay hub delivers faster, more resilient ship-to-ship support across South America
Read article
Digi Rig - Plan onshore. Execute offshore. With Confidence
Read article
Structural health monitoring for Asian offshore wind farm
Read article
World-first 10m diameter wind turbine monopile severance
Read article
Bay of Dakar cable lay testing for Enshore Subsea
Read article
Controlled flow excavation for mooring chain segments deburial
Read article

