A North Sea operator required an environmentally-conscious method of well plug and
abandonment for two wells. James Fisher responded to the challenge with the first
commercial deployment of SEABASS™.

Customer challenge 

The customer required a safe, cost-effective and environmentally-conscious decommissioning in line with industry best practice. To address this, James Fisher deployed the modular SEABASS™ system and handled full project management throughout subsea well abandonment. 

Solution for our customer 

James Fisher designed, engineered and delivered a reliable, single-trip solution to safely abandon AB2 status wells. The team drifted and scraped the well, pressure tested the system and perforated the 13-2/8" casing. Oil-based mud (OBM) was flushed, and fluid returns were managed before a 300ft environmental cement barrier was placed. 

This project not only demonstrated the capabilities of SEABASS™, but also how intelligent decommissioning solutions help our customers to safely reduce cost and boost operational efficiency.
RICHARD HENDERSON, ENGINEERING DIRECTOR (DECOMMISSIONING), ​ JAMES FISHER & SONS PLC

Customer impact

  • Supported responsible decommissioning by removing OBM and other contaminants from casing annulus before environmental barrier application 
  • Effective back deck fluid management using filtration package avoided additional expense of port calls to empty storage tanks and dispose of contaminated fluids
  • Inaugural project delivered successfully due to experienced decommissioning project personnel and robust methodology. 
James Fisher is a global supplier of trusted engineering services across the industries we serve, with an unrivalled ability to develop innovative solutions that meet the constantly developing needs of our customers operating in challenging environments.