An international energy operator required a Zone 2-compliant high-pressure water supply system to deliver well testing activity. James Fisher supported our customer with a custom-designed booster pump system configured to the rig’s layout. 

Key Statistics

bar booster pump output pressure
year project

Customer challenge

This project required a reliable, high-pressure water supply to feed a water deluge system for heat attenuation during well testing activity. Electrical submersible and booster pumps were to be Zone 2-rated so they could safely function where flammable gases or vapours may be present. 

Solution for our customer 

James Fisher designed, built and tested a bespoke booster pump system configured to the rig’s layout. Specialist technicians also fabricated an A-frame to maximise available space during installation of the submersible pump through the moonpool. 

This package delivered reliable performance, while our specialist technicians intelligently integrated it into the rig’s systems – delivering a solution to protect safety and productivity.
Ian Dixon, Workshop Supervisor, James Fisher and Sons

Our impact to our customer 

  • Considerable increase in deluge water delivery and pressure during function testing  
  • Safe operations and continuous uptime were prioritised by switching to the secondary pump during high ambient temperatures and increasing inspection frequency  
  • Maximised deck space, enabling installation beneath existing rig infrastructure   
  • Improved personal  and operational safety utilising Zone 2 classified equipment to meet the regulator and customer’s specifications 
James Fisher is a global supplier of trusted engineering services across the industries we serve, with an unrivalled ability to develop innovative solutions that meet the constantly developing needs of our customers operating in challenging environments.