An international energy operator required a Zone 2-compliant high-pressure water supply system to deliver well testing activity. James Fisher supported our customer with a custom-designed booster pump system configured to the rig’s layout.
Key Statistics
Customer challenge
This project required a reliable, high-pressure water supply to feed a water deluge system for heat attenuation during well testing activity. Electrical submersible and booster pumps were to be Zone 2-rated so they could safely function where flammable gases or vapours may be present.
Solution for our customer
James Fisher designed, built and tested a bespoke booster pump system configured to the rig’s layout. Specialist technicians also fabricated an A-frame to maximise available space during installation of the submersible pump through the moonpool.
Our impact to our customer
- Considerable increase in deluge water delivery and pressure during function testing
- Safe operations and continuous uptime were prioritised by switching to the secondary pump during high ambient temperatures and increasing inspection frequency
- Maximised deck space, enabling installation beneath existing rig infrastructure
- Improved personal and operational safety utilising Zone 2 classified equipment to meet the regulator and customer’s specifications

Download the "Supporting safe well testing with Zone 2 rig deluge system" case study to share with your team.
More case studies

JFD completes hyperbaric test for Verlume’s Orah subsea enclosure, supported by James Fisher Energy’s R2S technology
Read article
Ageing Assets: Helping South America’s Onshore Energy Industry Plan with Confidence
Read article
New Uruguay hub delivers faster, more resilient ship-to-ship support across South America
Read article
Digi Rig - Plan onshore. Execute offshore. With Confidence
Read article
Structural health monitoring for Asian offshore wind farm
Read article
World-first 10m diameter wind turbine monopile severance
Read article
Bay of Dakar cable lay testing for Enshore Subsea
Read article
Controlled flow excavation for mooring chain segments deburial
Read article