![](https://cdn-jfisher-media-prod.azureedge.net/qydbiedr/hydrostatic_pressure_test-1.png?height=195&rxy=0.5%2C0.5&width=340)
JFD conducts hydrostatic pressure test
Read article
The 18km export cable sits at depths between 5m and 35m and provides the electricity transmission connection for the 71-turbine offshore wind project, which is located 13km to 22km off the north-west coast of France.