- Markets
- Oil and gas
- Marine
- Nuclear
- Defence
- Transport and infrastructure
- Renewable energy
- Ports and terminals
- Construction
- Services
- Inspection and monitoring
- Lifting and handling
- Marine services
- Mooring and fendering
- Nuclear equipment and services
- Offshore support
- Design and engineering
- Submarine rescue
- Subsea
- Investors
- COVID-19
- Share price summary and chart
- Major shareholders
- Financial information
- Board of Directors
- Advisors and registrars
- AGM information
- Investor news (RNS)
- Governance
- Investor relations contact information
- Be ScamSmart
- Condition monitoring
- Construction plant productivity and safety
- Onshore geotechnical monitoring
- Load cells
- Marine safety systems
- Nuclear plant characterisations
- Offshore safety systems
- PyroSentry™
- Radiation detection equipment
- Strain rings
- Structural monitoring
- X-ray inspection systems
- Container Weight System™
- Crane overload monitoring
- Hose and umbilical reelers
- Lifting equipment
- Load links
- Load shackles
- Marine cranes
- Winches and hoists
- Fuels infrastructure
- Mermaid®
- Offshore personnel
- Offshore Wind Management System®
- Ship management services
- Ship-to-ship transfers
- Ship-to-Turbine™
- Shoreside support
- Surface preparation
- Vessel chartering
- Wind turbine blade inspections
- Site preparation
- Installation and commissioning
- Operations and maintenance
- Digital solutions
- Anchor and chain monitoring
- Deck and mooring equipment
- Fendering
- Flotation
- Line tension monitors
- Mooring load monitoring
- Towing load monitoring
- Building infrastructure and services
- Containerised systems
- Engineered containments
- Manipulators and tooling
- Mechanical and remote handling
- Radiation tolerant equipment
- Remote inspection systems
- Safety and control systems
- Shielded equipment and facilities
- Trials, training and simulation
- Artificial lift
- Compressors and breathing air compressors
- Centrifugal and positive displacement pumps
- Heat suppression
- Offshore equipment
- Offshore pipeline services
- Steam generators
- Safety slick joint
- Safety bails
- Well test support
- Aerospace engineering
- Fabrication
- Hazardous area design and engineering
- Marine projects
- Mechanical and electrical design
- Specialist engineering design
- Specialist structures consultancy
- Atmosphere sampler
- ELSS pods and bags
- Equipment assessment and support
- Flyaway ROV systems
- Inflatable freeboard extender
- Intervention targets
- James Fisher Submarine Rescue Service
- LR5 manned submersible
- Submarine escape training tower
- Submersible mating targets
- Subsea operations training
- Transfer under pressure systems
- Dive equipment
- Diving services
- Remotely operated vehicles (ROVs)
- Salvage
- Subsea excavation
- Subsea engineering
- Containerised deployment solutions
- Launch and recovery systems
- Swimmer delivery vehicles
- Special operations consultancy
- Special operations training
- Company reports, accounts and presentations
- Dividend centre
- Financial calendar
- Five year record
- Sector review
- Our stakeholders
- Committees
- Principal risks and uncertainties
- Business ethics, anti-bribery and corruption policies
- Modern slavery act transparency statement
- Gender pay report
- Tax strategy
- Health and safety
- Our people
- The Sir John Fisher Foundation
- Board changes - Remuneration
- Annual Report and Accounts for the year ended 31 December 2021
- Subtech South Africa (Pty) Ltd, completes major BBBEE transaction
- James Fisher tackles supply chain challenges with seasonal charter agreement for multipurpose service vessel
- 2021 full year results
- Archive
- JFD conducts a hydrostatic pressure test
- James Fisher increases offshore wind asset operations and maintenance (O&M) portfolio
- JFD hosts a dive tank test and demonstration
- JFD tests a submarine hull at their National Hyperbaric Centre
- Archive
JFD tests a submarine hull at their National Hyperbaric Centre
JFD was commissioned to test a submarine hull at their National Hyperbaric Centre in Aberdeen, UK.
Due to the length of the submarine hull, the work chamber door had to be removed by their gantry crane then refitted once the submarine was inside the work chamber. The full 300cm (internal diameter) x 800cm (internal length) and 63m2 volume of the chamber was used in the test with only cm’s to spare from the end of the submarine and internal wall.
JFD used a 100 Tonne mobile crane to offload the submarine from the client trailer on arrival, load onto their trolley and into the chamber where it was strapped down to overcome the buoyancy. The chamber was then filled with water and the pressure test conducted on the submarine to give our client confidence that their equipment could withstand the pressures it would be subjected to in regular operations, all within a safe and controlled environment.
Following the successful pressure test on the submarine it was removed from the chamber, loaded back on the trailer and transported back to the client. JFD were then able to re-install the work chamber door.