James Fisher provides support services for Dolwin 1 Alpha offshore wind farm

Dolwin 1 Alpha required the de-burial and recovery of export cables with the use of a Mass Flow Excavator (MFE) in the summer of 2013.

If you would like to read more please register here or login below.

BACK TO TOP